EV Conversion Cost Tracker

Current running total: R109919

Current running cost recovery: R3000

I’m just appending my costs as I go. I doubt I’ll use everything, so I’ll also add cost recovery line items as I sell stuff, or avoid regular car costs as I replace broken regular stuff with EV compatible stuff.

Costs

Date Description Units Cost Running Total
Aug 23 3kw Eltec Charger 3 17038,99 17038,99
Aug 23 DC-DC Voltage Converter 1 4664,77 21703,76
Aug 23 70kw AC Electric Motor 2 7737,38 29441,14
Aug 23 High Voltage Inverter 2 5139,63 34580,77
Aug 23 Drive Shafts 4 3798,86 38379,62
Aug 23 Programmable CanBUS Display 1 4720,64 43100,26
Aug 23 Electronic Control Unit 1 5698,28 48798,55
Aug 23 DC Water Heater 1 2402,22 51200,77
Aug 23 DC Air conditioner compressor 1 2402,22 53602,98
Aug 23 50mm2 orange silicone cable 25 2402,22 56005,20
Aug 23 Contactor Box and Precharge Circuit 1 1703,90 57709,10
Aug 23 Safety Plug 1 1703,90 59413,00
Oct 23 Shipping 22359,55 81772,55
Oct 23 Customs Duty 4907,55 86680,10
Oct 23 Customs VAT 9758,25 96438,35
Oct 23 Shipping Storage 1618,74 98057,09
Oct 23 Packaging Disposal 402,50 98459,59
Nov 23 Volvo Power Steering Pump 1 2700 101159,59
Nov 23 Power Steering Pump Install 3000 104159,59
Nov 23 1.5kwh Li Ion Test Battery 1 5760 109919,59
Dec 11 Plastic test battery box 1 150

Cost recovery

Date Description Units Cost Running Total
Dec 23 Power steering pump OEM inc labour 1 3000 3000